Font Size

Profile

Layout

Direction

Menu Style

Cpanel

PetroUsaha

Name Contact No. Address State Country
PetroUsaha Kota Kinabalu (HQ) 088 - 253 969 / 262 037 6th Floor, Wisma BSN, Jalan Kemajuan Karamunsing, Kota Kinabalu Sabah Malaysia
PetroUsaha Kuala Lumpur 03 - 2162 9969 Suite 13A.04, Level 13A, Plaza 138, Jalan Ampang Kuala Lumpur Malaysia
PetroUsaha Labuan 019 - 812 0200 PetroUsaha Yard, Mile 8, Jln Merinding Labuan F.T Malaysia

CIVIL, STRUCTURAL & BUILDING CONSTRUCTION


No.Project NameScope of WorkCompletion YearClientPosition
1. Subcontract Works for Civil Works (Package 2-C-Area 220 and Area 310) for Sabah Oil & Gas Terminal Civil Constructions 2011 Samsung / Petronas Carigali Sdn Bhd Subcontractor
2. Provision of Roof Upgrading for Two (2) Buildings at Sabah Gas Terminal (SBGAST) Civil & Building Constructions 21 Nov 2011 to 20 Jan 2012 Petronas Carigali Sdn Bhd Main Contractor
3. Relocation Works of 2X23mw GE541B6 Gas Turbinesfrom Teluk Ewa, Langkawi to 132kv Tawau Main Intake Station, Sabah Civil, Structural & Building Package May - Aug 2012 SESB / Turcomp Engineering Sdn Bhd Subcontractor
4. Tank Dike Concrete Lining Work, Local Support Foundation Works and Drainage Ditch Work for Sabah Oil & Gas Terminal Civil Constructions Sep 2012 Samsung / Petronas Carigali Sdn Bhd Subcontractor
5. Supply Fabrication & Construction of Civil Works-Package 1 (SAMUR) Civil Constructions 29 Oct 2012 - 28 Sep 2013 APEX/Rekayasa Subcontractor
6. EPC for Material Off Loading Facilities MOLF (SAMUR) Civil Constructions 29 Oct 2012 - 28 Apr 2013 APEX/Rekayasa Subcontractor



OFFSHORE CONSTRUCTION & MAINTENANCE


No.Project NameScope of WorkCompletion YearClientPosition
1. Structural Upgrade of Well Head Platform, Injection of Ducorit at SJFT-B Strengthening Work March to May 2006 Densit Asia Pacific Sdn Bhd / SHELL Direct
2. Structural Update of Jacket Member Strengthening at SJFT-B Strengthening Work June to August 2006 Sarku Eng. Services Sdn Bhd / SHELL Subcontractor
3. Inspection, Engineering Design Work on Vessel Impact Damaged Platform Petronas Baram Platform Project Designing Work April to May 2008 RNZ Integrated (M) Sdn Bhd / Petronas Consultation
4. Repair and Strengthening Work on Vessel Impact Damaged Platform Petronas Baram Platform Project Strengthening / Grouting Work April to May 2008 PTIS-Baxtech JV Sdn Bhd / SHELL Subcontractor
5. Skirt Piles Grouting Project for PC4 Gas Development Project Grouting Work Oct 2008 (only 10 days) TL Offshore Sdn Bhd / Petronas Subcontractor
6. Provision for the Supply of Manpower for Oversea Grouting Services Manpower Supply 10 Oct 2008 to 30 Sept 2009 Densit Asia Pacific Sdn Bhd Direct
7. Bokor Phase 2 Redevelopment Project (Grouting Services) Strengthening Jacket for BODP-A, BODP-B and BOP-A Platform Strengthening / Grouting Work Aug 2008 to Jan 2009 Vastalux Sdn Bhd / Petronas Subcontractor
8. Provision of Grouting Materials, Equipment & Vessel Spread for MDPPJ and MLQJ, CPOC JDA Block B-17 Field, Malaysia and Thailand Boarder Grouting Work 09 July 2009 to 19 Aug 2009 TL Offshore Sdn Bhd / Petronas Subcontractor
-Jacket Grouting
-Freespan Pipeline Correction
9. Inspection, Repair and Grouting of Conductor at Well No.114 for F23DP-A Platform Grouting Services 6 Nov 2009 to 31 March 2010 Shell Exploration and Production Direct
10. Bokor Phase II Redevelopment Project - grouting for BODP-B, BODP-A and BOP-A Platform (Revisit) Grouting and Strengthening 5 Feb to 15 Mar 2010 Allied Marine & Equipments Sdn Bhd / Petronas Subcontractor
11. Conceptual & DD St Joseph Re-Development Project (Finite Element Analysis) Engineering Services 25 Feb to 24 Mar 2010 MMC Oil & Gas Engineering Sdn Bhd / SHELL Direct
12. Grouting of Brace Members for SJP-A Platform, St. Joseph Field Grouting Services 23 April to 12 June 2010 Offshore Subsea Works / SHELL Subcontractor
13. UHPC Strengthening of Underwater Member at BEP-A Grouting Services 8 March to 9 March 2010 Allied Marine & Equipment Sdn Bhd / Petronas Subcontractor
14. Provision of Grouting Services, Materials and Equipment for Topside at EWDP-B for PCSB 2010 Grouting Services 18 March to 25 March 2010 Allied Marine & Equipment Sdn Bhd / Petronas Subcontractor
15. Provision of Grouting Services for F23R-A (Package D) for 2010 Integrated Transportation and Installation of Offshore Pipelines and Facilities Grouting Services 10 May to 29 May 2010 TL Offshore Sdn Bhd / SHELL Subcontractor
16. Provision of Grouting Services for CPDR-A (Package D) for 2010 Integrated Transportation and Installation of Offshore Pipelies and Facilities Grouting Services 12 Sept to 3 Oct 2010 TL Offshore Sdn Bhd / SHELL Subcontractor
17. Provision of Grouting Services, Materials and Equipment for Bokor Revisit Project Grouting Services Sept 2010 Allied Marine & Equipments Sdn Bhd / Petronas Subcontractor
18. Provision for Manpower Supply (Assistant Grouting Personnel) for MY 5050 Oman F. Grouting Work Jan to Aug 2011 Densit Asia Pacific Direct
19. Restoration of 5 Conductors on F23 MYR Grouting Services Jan to Dec 2011 Sarawak Shell Berhad Direct
20. Supply of ULO Fabric Formwork Mattress and ULO Grouting Nozzle ULO Supply Jan 2011 Densit Asia Pacific Direct
21. Provision of Grouting of Riser Guard Clamp (Material only) SJK-A Grouting Work Apr to May 2011 Offshore Subsea Works Sdn Bhd Subcontractor
22. Provision of Grouting of Riser Guard Clamp SJK-A Grouting Work May 2011 Offshore Subsea Works Sdn Bhd Subcontractor
23. Jacket Leg & Pile Sleeve Grouting Deendayal, India Project Grouting Work Apr to May 2011 Densit Asia Pacific Subcontractor
24. Grouting of Jacket – Pile Annuli of Platforms N14, N17 & N18 for 04 Well MHN Redevelopment Project Grouting Work May 2011 Densit Asia Pacific Subcontractor
25. Provision of Grouting Work at Turkmenistan Grouting Work Aug 2011 Densit Asia Pacific Subcontractor
26. Provision of Grouting Services at Tukau TKDP-A Platform Grouting Work Aug-11 Petra Resources Sdn Bhd / Petronas Subcontractor
27. Provision of Grout Bag, Grouting Spreads and Installation Servicing for Pipeline Span Correction F-28 Project Grouting Work Aug-Sept 2011 TL Offshore / Shell Subcontractor
28. Provision and Supply of Grouting Materials, Equipments, and Manpower for BERANTAI BWHP - A Jacket Installation Y2011. Grouting Work Sept 2011 TL Offshore / Petronas Subcontractor
29. Provision of Grout Bag, Grouting Spreads and Installation Servicing for Pipeline Span Correction CiliPadi Project Grouting Work Oct 2011 TL Offshore / Shell Subcontractor
30. Transportation and Installation of Offshore Facilities for YETAGUN, MYANMAR Development for Y2011 - Provision of Grouting Services for YETAGUN C Structure Installation Grouting Work Nov 2011 TL Offshore Subcontractor
31. Provision of Grouting Services, Materials and Equipment for Kinabalu KNPG - B Grouting Work Dec-11 Allied Marine & Equipments Sdn Bhd / Petronas Subcontractor
32. Grouting of Underwater Clamps & Members for NASR N4 & N1 Jacket Strengthening Phase 1 Grouting Work 16 Apr - 10 May 2012 Nautic Offshore Subcontractor
33. Grouting of Underwater Clamps & Members for NASR N4 & N1 Jacket Strengthening Phase 2 Grouting Work June 2012 Nautic Offshore Subcontractor
34. Provision and Supply of Grouting Services Inclusive of Manpower, Materials and Equipment for PTSA Jacket Grouting Work July 2012 TL Offshore / Murphy Subcontractor
35. Provision and Supply of Grouting Services Inclusive of Manpower, Materials and Equipment for SMDP-B Grouting Work Sept 2012 Petronas Carigali Sdn Bhd/SBO Subcontractor
36. SSB/SSPC Inspection, Maintenance and Repair (IMR) Campaign Grouting Work Oct 2012 Subsurf Sdn Bhd / SHELL Subcontractor
37. Provision of Conductor Repair Services for PCSB (SMDP-B) Grouting Work Jan to Feb 2013 Petronas Carigali Sdn Bhd/SBO Direct



UNDERWATER SERVICES


No.Project NameScope of WorkCompletion YearClientPosition
1. Supply Divers for Sea Chest Blanking Job Grouting Work May 2011 M3nergy FPSO Perintis Sdn Bhd / Petronas Direct
2. Provision of Eye Ball ROV for FPSO Mooring Chain - BERANTAI Project Grouting Work Sept 2011 TL Offshore Subcontractor
3. Provision of Eye Ball ROV for FPSO Mooring Chain Installation - BERANTAI Phase 2 ROV Feb-12 TL Offshore Subcontractor
4. Provision and Supply of Observation Class ROV Services (Sea-eye Tiger ROV System) for Cendor Phase 2 ROV June 2012 TL Offshore Subcontractor



ENVIRONMENTAL SERVICES


No.Project NameScope of WorkCompletion YearClientPosition
1. Metocean Meteorological Services Numeral Modeling System Environmental Services June 2012 Petronas Carigali Sdn Bhd Direct



TRADING


No.Project NameCompletion YearClient
1. Supply and delivery of Key box Nov 2011 TLDM
2. Supply and delivery of curtains Nov 2011 TLDM
3. Supply and delivery of measurement tools to SOGT, Kimanis 11 Nov 2011 Samsung Engineering
4. Supply and delivery of portable cabin (10ft x 10ft) to SOGT, Kimanis 20 Nov 2011 Samsung Engineering
5. Supply and delivery of Chemnical Emulgen: Permatex Fast Orange to Petronas Carigali Labuan 19 Dec 2011 Petronas Carigali Sdn Bhd
6. Supply and delivery of portable cabin (20ft x 10ft) to SOGT, Kimanis 18 Jan 2012 Linsun Engineering
7. Supply and delivery of Angle steel and brush paints to PML, Labuan 17 Feb 2012 Petronas Methanol Labuan
8. Maintenance service for 2 unit emergency generator set 27 Feb 2012 Markas Angkatan Kapal Selam TLDM (MAKS)
9. Supply and delivery electrical items 2 March 2012 Petronas Methanol Labuan (PML)
10. Maintenance service for 9 unit main switchboard and 15 unit sub-switchboard 6 March 2012 Markas Angkatan Kapal Selam TLDM (MAKS)
11. Supply and delivery floodlight to SOGT Project Kimanis 14 March 2012 Samsung Engineering (Malaysia) Sdn Bhd & Naim Engineering Sdn Bhd
12. Supply ammeters April 2012 Asian Bintulu Fertilizer (ABF)
13. Supply manpower, tool and consumables for installation of 10" x 150" MOV ball valve April 2012 Petronas Dagangan Berhad
14. Supply Emulgen May 2012 RANHILL Powertron
15. Supply Water Pumps (10 sets C/W Accesories) June 2012 Samsung Engineering (Malaysia) Sdn Bhd
16. Supply of Ducorit S5 July 2012 Nautic Offshore Pte Ltd
17. Supply pipes to SOGT, Kimanis site August 2012 Samsung Engineering (Malaysia) Sdn Bhd
18. Supply of Cutter Machine c/w Diesel Engine for Lansat Substation Project, Kimanis Sept 2012 Quality Alliance Sdn Bhd
19. Supply of Construction Materials for Lansat Substation Project, Kimanis Sept 2012 Quality Alliance Sdn Bhd
20. Supply of Steel Bar for Lansat Substation Project, Kimanis Sept 2012 Quality Alliance Sdn Bhd
21. Supply of Septic Tank for Lansat Substation  Project, Kimanis Sept 2012 Quality Alliance Sdn Bhd
22. Supply of Construction Materials for Lansat Substation Project, Kimanis Sept 2012 Quality Alliance Sdn Bhd
23. Supply of Steel Bar for SOGT Project, Kimanis Sept 2012 Techcom Enterprise
24. Supply piping support materials to SOGT Kimanis site Sept 2012 Samsung Engineering (Malaysia) Sdn Bhd
25. Supply of Construction Materilas to Sipitang Project Sept 2012 Quality Alliance Sdn Bhd
26. Supply of Steel Bar to Lansat Substation, Kimanis Sept 2012 Quality Alliance Sdn Bhd

It is the policy of PetroUsaha to make 55 practice as a working culture to achieve the following:

  • To keep the work place more organized, clean and well kept in order to create a conducive working environment.
  • To incalculate the spirit of cooperation and togetherness among staff.
  • To strive for high quality work and productivity to meet the expectation of our clients.

 

Ambotola Pelu

Chief Executive Officer




Sanusi Shahnon

Chief Operating Officer




What's New

Our Core Businesses